Mechanical

Wind Turbine Tower Failure - Orkney Islands, UK

02 October 2014

Scenario

Envista Forensics mechanical and electrical engineers were retained to determine the root cause of several monopole wind farm tower failures.

Activities

The on-site activities included detailed inspection of all the towers, the use of a loader and angle grinder to cut the selected samples, and coordination with all parties involved.

Outcome

Following Envista's analysis, it was concluded that the towers failed due to either incorrect welding and/or the hot dip galvanizing process. Envista engineers also noted a number of "beach marks" on the failed surfaces, indicative of fatigue that developed over time, and no apparent overload on the bearings.

Has a recent catastrophe affected you?

Our experts are ready to help.

How Can We Help You?

We have experts in multiple disciplines all around the world. Talk to us and we'll help you find the right expert for the job.

 Envista Forensics Logo
Explore Our Site

Our job is to solve complex problems for our clients, in the face of a disaster. We serve business owners, small and large, no matter where they are in the world, and no matter what problem they are facing.