Wind Turbine Tower Failure - Orkney Islands, UK

02 oktober 2014

Scenario

Envista Forensics mechanical and electrical engineers were retained to determine the root cause of several monopole wind farm tower failures.

Activities

The on-site activities included detailed inspection of all the towers, the use of a loader and angle grinder to cut the selected samples, and coordination with all parties involved.

Outcome

Following Envista's analysis, it was concluded that the towers failed due to either incorrect welding and/or the hot dip galvanizing process. Envista engineers also noted a number of "beach marks" on the failed surfaces, indicative of fatigue that developed over time, and no apparent overload on the bearings.

Har din virksomhed været udsat for skade?

Vores eksperter kan hjælpe dig!

Hvordan kan vi hjælpe dig?

Vi har eksperter i mange tekniske discipliner fordelt over hele verden. Kontakt os, så vi kan finde den rigtige ekspert til opgaven.

 Envista Forensics Logo
Udforsk vores hjemmeside

Vores job er at løse komplekse udfordringer for vores kunder ved skadehændelser. Vi servicerer virksomhedsejere, små som store og uanset, hvor det er henne i verden og uagtet af, hvilket problem de står overfor.